Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-pagenavi domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/html/caraa2.savana-hosting.cz/public_html/caraa.cz/wp-includes/functions.php on line 6114
AFI – realizace

AFI – realizace

 

AFI

přestavba s dostavba průmyslového objektu – interiér / reconstruction and extension of an industrial building – interior

místo / location: Praha 9 – Vysočany

autor / author: Štěpán Kubíček, Martina Buřičová, spolupráce / cooperation: Zuzana Pízová, Ondřej Kramoliš, fotografie / photographer: Andrea Thiel Lhotáková

investor: AF BKK s.r.o.

datum návrhu / date of design: návrh 11/2003, projekt / project  07/2005,  realizace / date of realization: 02/2009

náklady / costs: 43,0 mil. Kč

popis: interiér historického průmyslového objektu navržený pro víceúčelové využití / description: interior of historic industrial building for multifunctional using

projekt / project