Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-pagenavi domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/html/caraa2.savana-hosting.cz/public_html/caraa.cz/wp-includes/functions.php on line 6114
AFH – realizace

AFH – realizace

AFH

hřiště na střeše průmyslového objektu / court on the roof of historical  industrial building

místo / location: Praha 9 – Vysočany

autor / author: Štěpán Kubíček, Martina Buřičová, spolupráce / cooperation: Zuzana Pízová, Ondřej Kramoliš, fotografie / photographer: Andrea Thiel Lhotáková

investor / investor:  AF BKK s.r.o.

datum návrhu / date of design: návrh 11/2003, projekt / project  07/2005,  realizace / date of realization: 02/2009

náklady / costs: 2,0 mil. Kč

popis: venkovní hřiště pro basketbal a volejbal na střeše historického průmyslového objektu/ description: exterior basketball and volleyball court on the roof of historic industrial building