Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wp-pagenavi domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/html/caraa2.savana-hosting.cz/public_html/caraa.cz/wp-includes/functions.php on line 6114
AFB – realizace

AFB – realizace

AFB

přestavba s dostavba průmyslového objektu / reconstruction and extension of an industrial building

místo / location: Praha 9 – Vysočany

autor / author: Štěpán Kubíček, Martina Buřičová, spolupráce / cooperation: Zuzana Pízová, Ondřej Kramoliš, fotografie / photographer: Andrea Thiel Lhotáková, Tomáš Novák

investor / investor:  AF BKK s.r.o.

datum návrhu / date of design: návrh 11/2003, projekt / project  05/2005,  realizace / date of realization: 11/2008

náklady / costs: 43,0 mil. Kč

popis: přestavba historického průmyslového objektu pro víceúčelové využití / description: reconstruction of historic industrial building for multifunctional using

projekt  / project

http://www.podkovarska.cz/napsali-o-nas/